Inner Unit B9

Category:
  • Formwork form tie Inner Unit is a steel rod that acts as the central load-bearing components in a B type concrete formwork system. It is designed to be cast permanently inside concrete walls to hold the formwork panels at a precise, fixed distance
  • Inner Units B9 (W 3/8”) of all sizes can be made & supplied upon request depending on
    required wall thickness.
  • Formwork form tie Inner Unit is a steel rod that acts as the central load-bearing components in a B type concrete formwork system. It is designed to be cast permanently inside concrete walls to hold the formwork panels at a precise, fixed distance
  • Inner Units B9 (W 3/8”) of all sizes can be made & supplied upon request depending on
    required wall thickness.